HomeIndustriesFood & Beverage

Industry

Food & Beverage

From farm to fork, we help food and beverage manufacturers navigate complex regulatory requirements, manage volatile demand, and build technology platforms that ensure safety, traceability, and profitability across every stage of production.

Industry Overview

The food and beverage industry operates under some of the most stringent regulatory and quality requirements of any manufacturing sector. From FDA and FSMA compliance to allergen management and shelf-life tracking, producers must maintain complete visibility across ingredients, processes, and finished goods — all while managing razor-thin margins and unpredictable consumer demand.

Legacy ERP systems often lack the specialized capabilities food and beverage companies need: catch-weight processing, lot traceability, recipe and formula management, and real-time quality control. Cherry Street Consulting helps F&B manufacturers select, implement, and optimize technology platforms purpose-built for the unique challenges of perishable goods production and distribution.

Sector Snapshot

  • Strict FDA, FSMA, and GFSI compliance mandates
  • Complex allergen tracking and labeling requirements
  • Catch-weight and variable-weight inventory management
  • Shelf-life constraints driving production scheduling
  • Demand volatility driven by seasonality and promotions

Key Challenges We Solve

Purpose-built solutions for the unique complexities of food and beverage manufacturing.

FDA/FSMA Compliance

Automated compliance workflows, audit-ready documentation, and preventive controls management aligned to FDA Food Safety Modernization Act requirements.

Allergen Management

End-to-end allergen tracking from raw materials through finished goods, with automated labeling validation and cross-contamination risk analysis.

Catch-Weight Processing

Variable-weight inventory management with real-time catch-weight capture, pricing calculations, and accurate costing across production and distribution.

Shelf-Life Tracking & Demand Volatility

FEFO-based inventory rotation, expiration date management, and AI-driven demand sensing to reduce waste and optimize production scheduling.

We work across all major ERP platforms for this industry. View our full platform expertise →

Take the First Step

Ready to Transform Your Operations?

Schedule a complimentary 30-minute strategy session with a senior consultant. No sales pitch — just clarity on your path forward.

Response guaranteed within 1 business day · 225 Cherry Street, New York NY